CS312 - Final Project Checklist

To help you keep track of what you need to hand in, here is a checklist of the material I expect, and when I expect it:

(05-16 11:59p) Presentations
Each group should submit a PDF version of the slides they use for the presentation
(05-17 6:00p) Sprint report #3
Everyone should turn in a final sprint report in the same format as the others
(05-22 6:00p) Final project due
Each group should post a link to the repository (with full README) and (if available) a link to a running instance of their app
(05-22 6:00p) Team Writeup
Each group needs to turn in a three page summary of the project (details)
(05-22 6:00p) Individual report
Everyone must turn in a final report about their contribution and the contributions made by everyone else in the group (details)